NEW QUESTION # 26
Which statement defines the Project Workspace?
- A. A central location transform the navigation of lists and forms into an interactive graphical experience
- B. A central location for creating and managing projects
- C. A central location to view of all projects in a portfolio to prioritize work
- D. A central location for viewing and assessing business demands
Answer: B
Explanation:
Explanation
According to the ServiceNow documentation1, the Project Workspace is a central location for creating and managing projects. It provides a graphical interface that allows users to view and edit project information, such as tasks, resources, risks, issues, and dependencies. The Project Workspace also enables users to collaborate with team members and stakeholders, track project progress, and generate reports.
The other options are incorrect because:
A: A central location to view of all projects in a portfolio to prioritize work: This describes the Portfolio Workbench, not the Project Workspace2.
C: A central location transform the navigation of lists and forms into an interactive graphical experience: This describes the Lens, not the Project Workspace3.
D: A central location for viewing and assessing business demands: This describes the Demand Workbench, not the Project Workspace.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-portfolio-managem
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/it-business-management/c
:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/conc
NEW QUESTION # 27
If a sub-project and parent project have different project currencies, this property should be set to true for cost roll-ups.
- A. com.snc.project.copy.additional_attributes
- B. com.snc.project.calculate_roi
- C. com.snc.project.rollup_project_start_date
- D. com.snc.project.multicurrency.rollup_if_different
Answer: D
NEW QUESTION # 28
Which is the minimum role that has access to the Project Administration > Settings > Preferences-Project module?
- A. it_program_manager
- B. it_project_manager
- C. it_pps_admin
- D. sys_admin
Answer: C
Explanation:
Explanation
According to the ServiceNow documentation1, the it_pps_admin role is the minimum role that has access to the Project Administration > Settings > Preferences-Project module. This role can configure the project preferences, such as the default project template, the default project currency, and the default project status.
The other options are incorrect because:
A: it_program_manager: The it_program_manager role can create and manage programs, but not project preferences2.
B: sys_admin: The sys_admin role can access all modules and features on the platform, but it is not the minimum role required for the Project Administration > Settings > Preferences-Project module3.
C: it_project_manager: The it_project_manager role can create and manage projects, but not project preferences4.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/refer
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-portfolio-managem
https://docs.servicenow.com/bundle/vancouver-platform-administration/page/administer/users-and-groups/conce
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/conc
NEW QUESTION # 29
Which role is needed to group related projects and demands?
- A. it_project_user
- B. it_project_manager
- C. it_program_manager
- D. it_demand_manager
Answer: C
Explanation:
Explanation
According to the ServiceNow documentation1, the it_program_manager role is needed to group related projects and demands. This role can create and manage programs, which are containers for projects and demands that share a common goal or objective. The other options are incorrect because:
B: it_project_manager: The it_project_manager role can create and manage projects, but not group them into programs2.
C: it_demand_manager: The it_demand_manager role can create and manage demands, but not group them into programs3.
D: it_project_user: The it_project_user role can view and edit project tasks, but not create or manage projects, demands, or programs4.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-portfolio-managem
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/refer
NEW QUESTION # 30
If a user creates a new demand from the demand workbench, what state will the system save the record in?
- A. open
- B. qualified
- C. approved
- D. draft
Answer: B
Explanation:
Explanation
According to the Using the Demand Workbench document, if a user creates a new demand from the demand workbench, the system saves the record in the qualified state and displays it on the bubble chart. The other options are not correct, as they are not the default state for a new demand created from the demand workbench.
The approved state is the final state for a demand that has passed all the assessments. The open state is the initial state for a demand that is created from the Service Catalog. The draft state is the state for a demand that is created from the Demand form.
NEW QUESTION # 31
Which role can configure the parameters of the demand workbench that is provided with the base system?
- A. it_pps_admin.
- B. it_project_manager.
- C. All roles.
- D. business_stakeholder.
Answer: A
Explanation:
Explanation
According to the Demand Workbench document, the role that can configure the parameters of the demand workbench that is provided with the base system is it_pps_admin. This role grants access to the Project Portfolio Suite application and allows the user to configure the demand workbench settings, such as the axes, the quadrants, the bubble size, and the color. The other options are not correct, as they are not roles that can configure the parameters of the demand workbench. The all roles option is too broad and does not specify a particular role. The business_stakeholder role grants access to the Business Stakeholder Portal and allows the user to view and submit demands. The it_project_manager role grants access to the Project Portfolio Management application and allows the user to create and update projects.
NEW QUESTION # 32
On the demand form, what does the Discount Rate impact?
- A. Net Present Value (NPV).
- B. ROI.
- C. Internal Rate of Return %.
- D. Financial Benefit.
Answer: A
Explanation:
Explanation
According to the ServiceNow documentation1, the discount rate on the demand form impacts the net present value (NPV) of the demand. The NPV is the difference between the present value of the benefits and the present value of the costs of the demand. The discount rate is the rate used to discount future cash flows to their present value. A higher discount rate means that future cash flows are worth less in the present, and vice versa. The other options are incorrect because:
A: ROI: The ROI (return on investment) is the ratio of the net value to the estimated cost of the demand. The discount rate does not affect the ROI, as both the net value and the estimated cost are based on the present value of the cash flows2.
C: Financial Benefit: The financial benefit is the sum of the present value of the benefits of the demand. The discount rate does not affect the financial benefit directly, but only indirectly through the NPV calculation3.
D: Internal Rate of Return %: The internal rate of return % (IRR) is the discount rate that makes the NPV of the demand equal to zero. The discount rate does not affect the IRR, but rather the IRR is derived from the NPV equation4.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/refe
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/conc
NEW QUESTION # 33
The RIDAC workflow can be modified by using which recommended feature?
- A. Service Catalog
- B. Flow Designer
- C. Project Form
- D. Workflow Editor
Answer: D
Explanation:
Explanation
According to the RIDAC (Risk, Issue, Decision, Action, and Request Changes) record entries for a project document, the RIDAC workflow can be modified by using the Workflow Editor, which is a graphical tool that allows you to create and edit workflows. The other options are not correct, as they are not recommended features for modifying the RIDAC workflow. The Project Form is used to create and update project records. The Flow Designer is used to automate processes without coding. The Service Catalog is used to order items and services.
NEW QUESTION # 34
Which of the following can be used to calculate planned cost when creating a resource plan?
Choose 2 answers
- A. Rate card
- B. Project rate
- C. Default rate
- D. Demand rate
Answer: A,B
Explanation:
Explanation
According to the ServiceNow documentation1, a rate card is a table that defines the hourly cost of labor for different roles or resources. A project rate is a fixed rate that is applied to all resources assigned to a project, regardless of their roles or individual rates. Both of these can be used to calculate the planned cost of a resource plan by multiplying the hours allocated to each resource by the corresponding rate. The other options are incorrect because:
A: Demand rate: A demand rate is a rate that is applied to a demand, not a resource plan. It is used to estimate the cost of fulfilling a demand before it is converted into a project2.
C: Default rate: A default rate is a rate that is applied to a resource when no other rate is specified. It is not a valid option for calculating the planned cost of a resource plan, as it is only used as a fallback option3.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/resource-management/con
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/resource-management/con
NEW QUESTION # 35
Which related lists should primarily be used to capture financial data in a project?
Choose 2 answers
- A. Programs
- B. Monetary Benefit Plans
- C. Risks
- D. Cost Plans
Answer: B,D
Explanation:
Explanation
Cost Plans and Monetary Benefit Plans are the related lists that should primarily be used to capture financial data in a project. Cost Plans allow you to define the expected costs of a project over time, based on the planned and actual work, resources, and expenses. Monetary Benefit Plans allow you to define the expected financial benefits of a project over time, based on the estimated and realized value, revenue, and savings. You can find more information about these related lists in the Product Documentation for ServiceNow.
NEW QUESTION # 36
When copying a source project to a target project, what fields are copied by default?
Choose 3 answers
- A. Planned dates.
- B. State
- C. Short description.
- D. Number.
- E. Duration fields.
Answer: A,C,E
NEW QUESTION # 37
What does the project status report allow project managers to do?
Choose 2 answers
- A. Print as a PDF attachment
- B. Show historical trend of project KPI's
- C. View the WBS
- D. View the project Gantt chart
Answer: A,B
Explanation:
Explanation
The project status report allows project managers to do the following:
Show historical trend of project KPI's: The project status report displays the key performance indicators (KPIs) of the project, such as schedule variance, cost variance, and earned value. It also shows the historical trend of these KPIs over time, which helps project managers monitor the progress and performance of the project. You can find more information about the project status report KPIs in the Product Documentation for ServiceNow.
Print as a PDF attachment: The project status report can be printed as a PDF attachment and sent to the stakeholders or sponsors of the project. This helps project managers communicate the status and health of the project in a clear and concise format. You can find more information about the project status report PDF attachment in the Product Documentation for ServiceNow.
NEW QUESTION # 38
To set up a group for selection in a resource plan, the group record needs to include which role?
- A. itil
- B. it_project_user
- C. pps_resource
- D. resource_manager
Answer: C
Explanation:
Explanation
According to the Assigning Resource Roles document, to set up a group for selection in a resource plan, the group record needs to include the pps_resource role. This role grants access to the Resource Management application and allows the group members to view and update their resource allocations. The other options are not correct, as they are not required for a group to be selected in a resource plan. The it_project_user role grants access to the Project Portfolio Management application and allows the user to create and update projects. The itil role grants access to the ITIL application and allows the user to manage incidents, problems, and changes. The resource_manager role grants access to the Resource Management application and allows the user to manage resource plans and allocations.
NEW QUESTION # 39
If a lens has four entities, which entity within the lens structure would not have a parent reference?
- A. Third-level entity
- B. Bottom entity
- C. Second-level entity
- D. Top-level entity
Answer: D
Explanation:
Explanation
According to the ServiceNow documentation1, a lens is a hierarchical structure that consists of entities and relationships. An entity is a data object that represents a business concept, such as a project, a demand, or a resource. A relationship is a link between two entities that defines how they are connected. A lens can have up to four levels of entities, each with a parent reference to the entity above it, except for the top-level entity, which has no parent reference. The top-level entity is the root of the lens and defines its scope and type. For example, a project lens has a project as the top-level entity, and a demand lens has a demand as the top-level entity.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/it-business-management/c
NEW QUESTION # 40
What minimum role is required to assign a time sheet policy to a user?
- A. timecard_admin.
- B. It is not possible to assign a time sheet policy to a user.
- C. it_project_manager.
- D. ppm_admin.
Answer: A
Explanation:
Explanation
According to the web search results1, the timecard_admin role is the minimum role that is required to assign a time sheet policy to a user. A time sheet policy is a rule that controls the creation and operation of time sheets for resources who log time against work items. The timecard_admin role can create and modify time sheet policies, time sheet groups, and time sheet periods, as well as approve time sheets or submit time cards on behalf of team members. The other options are incorrect because:
A: ppm_admin: The ppm_admin role is a higher-level role that can access all Project and Portfolio Management modules and features, but it is not the minimum role required for assigning a time sheet policy to a user2.
C: it_project_manager: The it_project_manager role can create and manage projects, but not assign time sheet policies to users3.
D: It is not possible to assign a time sheet policy to a user: This is false, as it is possible to assign a time sheet policy to a user by using the Time Sheet Policy field on the User form4.
1: 3 2:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/refer
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/time-card-management/ref
NEW QUESTION # 41
When can a user choose from multiple rate types for their work, while logging a time card?
- A. Only if this capability is enabled in the Project Record
- B. Only if the capability is enabled in the Time Sheet Policies
- C. Only if the capability is enabled in the Project Preferences
- D. Only one (1) rate type can apply
Answer: B
Explanation:
Explanation
According to the Using rate types and labor rate cards document, a user can choose from multiple rate types for their work, while logging a time card, only if the capability is enabled in the Time Sheet Policies. This capability allows users to select different rate types for different tasks, such as standard, overtime, or travel.
The other options are not correct, as they are not the places where the capability can be enabled. The Project Record is used to create and update project details, such as name, description, and state. The Project Preferences are used to set the default values for project fields, such as number, type, and priority. The option C is not correct, as more than one rate type can apply if the capability is enabled.
NEW QUESTION # 42
Use this table to configure the parameters displayed on a project card on the My Projects Space page of the Project Workspace.
- A. pm_toplevel_project
- B. pm_home_page_config
- C. pm_project
- D. project_template_config
Answer: B
Explanation:
Explanation
According to the ServiceNow documentation1, the pm_home_page_config table is used to configure the parameters displayed on a project card on the My Projects Space page of the Project Workspace. The other tables are used for different purposes:
pm_project: Stores information about projects2.
pm_toplevel_project: Stores information about top-level projects3.
project_template_config: Stores information about project templates.
NEW QUESTION # 43
If a sub-project and parent project have different project currencies, this property should be set to true for cost roll-ups.
- A. com.snc.project.copy.additional_attributes
- B. com.snc.project.calculate_roi
- C. com.snc.project.rollup_project_start_date
- D. com.snc.project.multicurrency.rollup_if_different
Answer: D
Explanation:
Explanation
According to the ServiceNow documentation1, this property controls whether the cost roll-ups are performed when a sub-project and parent project have different project currencies. If this property is set to true, then the system converts the sub-project currency to the parent project currency using the exchange rate table and performs the cost roll-ups. If this property is set to false, then the system does not perform the cost roll-ups for sub-projects with different currencies.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/refer
NEW QUESTION # 44
As a demand manager, you can view an artifact from a demand. What artifacts are part of a demand?
- A. Project, Defect, Requests.
- B. Stories, Vulnerability Tasks, Enhancements.
- C. Decision, Risk, Requirements.
- D. Incidents, Problems, Change.
Answer: C
Explanation:
Explanation
According to the ServiceNow documentation1, a demand manager can view and edit the following artifacts from a demand:
Decision: A decision that affects the demand or its outcome2.
Risk: A risk that could impact the demand or its outcome3.
Requirement: A requirement that defines the scope or functionality of the demand4.
The other options are not artifacts of a demand, but rather related entities that can be created from a demand or linked to a demand.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/task
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/task
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/demand-management/task
NEW QUESTION # 45
How many WBS levels can be shown on the planning console?
- A. Three.
- B. Two.
- C. No Limit.
- D. One.
Answer: C
Explanation:
Explanation
According to the ServiceNow documentation1, the planning console can show as many WBS levels as desired, starting from the level 1 to the lowest system components. The WBS levels can be expanded or collapsed by clicking the plus or minus icons next to the task names. The planning console also allows users to create, edit, and delete tasks, as well as add dependencies, assign resources, and track progress.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/conc
NEW QUESTION # 46
If a project manager is responsible for approving time sheets or submitting time cards on behalf of team members, they should be given what role?
- A. approval_admin.
- B. form_admin.
- C. timecard_admin.
- D. activity_admin.
Answer: C
Explanation:
Explanation
According to the ServiceNow documentation1, the timecard_admin role can approve time sheets or submit time cards on behalf of team members. This role also has the ability to create and modify time sheet policies, time sheet groups, and time sheet periods. The other options are incorrect because:
A: activity_admin: The activity_admin role can create and modify activities, activity sets, and activity plans2.
C: form_admin: The form_admin role can create and modify forms, form sections, and form layouts3.
D: approval_admin: The approval_admin role can create and modify approval rules, approval groups, and approval stages4.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/time-card-management/ref
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/refer
https://docs.servicenow.com/bundle/vancouver-platform-administration/page/administer/form-administration/con
https://docs.servicenow.com/bundle/vancouver-platform-administration/page/administer/approvals/concept/c_Ap
NEW QUESTION # 47
The color band at the top of the project card in Project Workspace displays what project attribute?
- A. Issues
- B. State
- C. Status
- D. Risk
Answer: C
Explanation:
Explanation
According to the ServiceNow documentation1, the color band at the top of the project card in Project Workspace displays the project status. The project status is a calculated field that indicates the health of the project based on the schedule, cost, and scope variance. The color band can be green, yellow, or red, depending on the status value. The other options are incorrect because:
B: Risk: The risk is a potential problem that could affect the project or its outcome. The risk level is displayed as a circle icon on the project card, not as a color band2.
C: State: The state is the current phase of the project, such as Draft, Planning, Work in Progress, or Closed. The state is displayed as a text field on the project card, not as a color band3.
D: Issues: The issues are the actual problems that affect the project or its outcome. The number of issues is displayed as a badge icon on the project card, not as a color band4.
1:
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/conc
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/task/
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/refer
https://docs.servicenow.com/bundle/vancouver-it-business-management/page/product/project-management/task/
NEW QUESTION # 48
The Project management application supports two types of external dependencies. What are they?
Choose 2 answers
- A. Milestone Dependency.
- B. Hard Dependency.
- C. Soft Dependency.
- D. Task Dependency.
- E. Change Dependency.
Answer: B,C
Explanation:
Explanation
The Project Management application supports two types of external dependencies: hard dependency and soft dependency. A hard dependency is a dependency that must be met before a task can start or finish. A soft dependency is a dependency that is preferred but not mandatory for a task to start or finish. You can find more information about these dependency types in the Product Documentation for ServiceNow.
NEW QUESTION # 49
......