
Updated Jan-2022 E-S4HCON2022 Exam Practice Test Questions
Verified E-S4HCON2022 dumps Q&As 100% Pass in First Attempt Guaranteed Updated Dump
SAP E-S4HCON2022 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| SUM Execution Part > 12% | Perform the SUM execution part, including DMO |
| Manual Activities for SUM 8% - 12% | Describe the necessary manual preparation and follow-on activities for SUM |
| Handling of an SAP System Landscape 8% - 12% | Describe the handling of the SAP system landscape during SAP S/4HANA conversion and SAP system upgrade |
| SUM Prepare Part > 12% | Perform the SUM prepare part |
| Modification Adjustment 8% - 12% | Perform the modification adjustment with SPDD and SPAU |
| Downtime 8% - 12% | Describe the factors influencing downtime and techniques to reduce downtime |
| SAP S/4HANA Conversion Prepare Phase > 12% | Describe and perform the actions necessary during the SAP S/4HANA conversion prepare phase |
| SUM Monitoring and Troubleshooting 8% - 12% | Monitor and troubleshoot the SUM procedure |
E-S4HCON2022 Exam Certification Details:
| Exam: | 40 questions |
| Languages: | English |
| Level: | Specialist |
| Duration: | 90 mins |
| Cut Score: | 65% |
| Sample Questions: | SAP E-S4HCON2022 Exam Sample Question |
NEW QUESTION 29
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Downtime migration (EU_CLONE_MIG_DT_RUN)
- B. Uptime migration (EU_CLONE_MIG_UT_RUN)
- C. Shadow repository creation (EU_IMPORT*)
- D. ParaUel distribution (PARDIST_SHD)
Answer: B
NEW QUESTION 30
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
- A. SYCM (Simplification Database Content)
- B. ATC (ABAP Test Cockpit)
- C. SAT (Runtime Analysis)
- D. SE80 (Object Navigator)
Answer: B,D
NEW QUESTION 31
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
- D. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
Answer: A
NEW QUESTION 32
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. At the end of the downtime
- B. Early in the downtime
- C. As part of the cleanup process
- D. Before the downtime starts
Answer: D
NEW QUESTION 33
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path was stored in file host_profile during registration
- B. The path was stored to the environment of user <sid>adm during registration
- C. The path was stored in file sumabap conf during registration
- D. The path is taken from the URL entered in the browser to start SUM
Answer: C
NEW QUESTION 34
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
- C. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
- D. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
Answer: B
NEW QUESTION 35
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the main configuration option "Single System" in case of an upgrade.
- B. Using the main configuration option "Standard" when applying SAP Support Packages
- C. Using the database migration option (DMO) for SUM
- D. Using the main configuration option "Single System" when installing an Add-On
Answer: D
NEW QUESTION 36
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
- A. Generate it by analyzing the specific custom code via RFC
- B. Download it from SAP Support Portal
- C. Configure it within transaction ATC
- D. Apply the corresponding SAP note via SAP Note Assistant
Answer: B
NEW QUESTION 37
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. An overview about possible upgrade paths
- B. AA
- C. The corrections to the SUM Guide
- D. The link to different patch levels to SUM
Answer: A,C,D
NEW QUESTION 38
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:
- A. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
- B. You can record the modification adjustment during migration and use the transports in the next runs.
- C. You can verify that the content of the download directory matches the stack.XML file.
- D. You can find the optimal number of parallel R31oad processes by monitoring host performance.
Answer: B,D
NEW QUESTION 39
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- B. The upgrade of the PRD must be finished before you start new development in the DEV.
- C. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- D. The transport between Unicode and non-Unicode systems is forbidden.
Answer: A
NEW QUESTION 40
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phases DIFF*
- B. Phases EU_IMPORT*
- C. Phase RUN_RSDBSCPY
- D. Phase RUN_RSPTBFIL _ISUTABU
- E. Phase DOWNCONF_DTTRANS
Answer: A,B,E
NEW QUESTION 41
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. An additional temporary database is used during uptime
- B. TABIMJJPG is executed in uptime
- C. Dedicated application tables are migrated in uptime
- D. The repository is migrated in uptime
Answer: C
NEW QUESTION 42
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:
- A. Credentials of a named user in the development client of the development system
- B. Credentials of user DDIC in the development client of the development system
- C. Credentials of a named user in client 000 of the shadow system
- D. Credentials of user DDIC in client 000 of the shadow system
Answer: C
NEW QUESTION 43
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In DMO Migration Preparation
- B. In SUM Parameters
- C. In SUM Phaselist
- D. In Process Control Center
Answer: B,D
NEW QUESTION 44
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:
- A. Extract the SAP HANA client installation archive
- B. Move the SAPM update archive into the download folder
- C. Move the stack.xml update file into the download folder
- D. Extract the SAP HANA database installation archive
- E. Move the R3trans update archive into the download folder
Answer: A,B,C
NEW QUESTION 45
......
Ultimate Guide to Prepare Free E-S4HCON2022 Exam Questions & Answer: https://drive.google.com/open?id=123UWPP32dYsYU6lLCVrb-wLyRPZFKjvv
Pass SAP Certified Technology Specialist E-S4HCON2022 Exam With 55 Questions: https://www.passcollection.com/E-S4HCON2022_real-exams.html

