TopicDetails
Topic 1
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
  • Key Figures & Attributes
Topic 2
  • Create statistical forecast using historical data with basic methods
  • Planning Operators & Application Jobs
Topic 3
  • Define and view information with user-defined charts and dashboards
  • Supply and Response

 

NEW QUESTION 16
You want to set up demand sensing to analyze demand changes in execution or close to execution windows.
Which of the following conditions must you consider during the setup? Note: There are 2 correct Answers to this question.

  • A. Set up the forecast model to be executed at product-location level.
  • B. It is mandatory to load historical lag-based snapshot data.
  • C. The result generates sensed demand data at the monthly time granularity for the full time horizon
  • D. At setup test the system to run the demand sensing (full) algorithm weekly and the demand sensing (update) on a daily basis.

Answer: B,D

 

NEW QUESTION 17
You create an S&OP operator for heuristics on an SAP IBP project. What must you enable for the S&OP operator that is specifically relevant for subnetworks?

  • A. Balance Receipts parameter
  • B. Normalize Quotas parameter
  • C. Supply propagation
  • D. Compute Expected Supply parameter

Answer: D

 

NEW QUESTION 18
You want to restrict value entries outside of a specified range into a key figure. What setting will you use to achieve that goal?

  • A. IBP -> Data Validation in IBP Formatting Sheet tab
  • B. By restricting data input in the Key Figure Configuration app
  • C. Select Protect Active Worksheet in the About section of SAP IBP tab
  • D. IBP -> Lock Selected cells in IBP Formatting Sheet tab

Answer: B

 

NEW QUESTION 19
What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct Answers to this question.

  • A. Rename the charts.
  • B. Organize charts.
  • C. Display all assigned analytics on a single UI.
  • D. Link two analytics charts.
  • E. Add process templates.

Answer: B,C,E

 

NEW QUESTION 20
What is a prerequisite for modeling outsourced manufacturers with production capacity?

  • A. Use production lead times and offsets to manage components at the outsourced location.
  • B. Model production costs for internal and external production resources to model priority.
  • C. Model target inventory and stocks at the outsourced location.
  • D. Ensure that multiple modes of transportation are set up.

Answer: B

 

NEW QUESTION 21
You want to display and edit data in different units of measure (UOM). Which of the following must you consider before you use UOM?
Note: There are 3 correct Answers to this question.

  • A. Units of measure are usually not time-dependent.
  • B. Unit of measure is an attribute of a master data type, such as Product.
  • C. Conversion to the target unit of measure is handled by functionality of SAP IBP Excel UI
  • D. Units of measure are usually not time-independent.
  • E. Analytics provide the user with the option to select the target unit of measure.

Answer: A,B,E

 

NEW QUESTION 22
Analytics charts are created by the user in the Advanced Analytics application. What actions are possible in the Advanced Analytics app?
Note: There are 2 correct Answers to this question.

  • A. Group data.
  • B. Open graphics in Excel.
  • C. Apply filters on your data.
  • D. Merge charts together.

Answer: A,C

 

NEW QUESTION 23
You are configuring disaggregation for the KF1 key figure. Which methods can you apply? Note: There are 3 correct Answers to this question.

  • A. Disaggregation according to a user-defined expression
  • B. An internal system-generated disaggregation
  • C. Disaggregation according to an equal split
  • D. Disaggregation in batch triggered by an application job
  • E. Proportional disaggregation by using KF2 in the expression

Answer: A,C,E

 

NEW QUESTION 24
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?
Note: There are 3 correct Answers to this question.

  • A. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • B. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • C. It checks whether the required planning level master data exists for a subset of input key figures.
  • D. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.

Answer: C,D,E

 

NEW QUESTION 25
Which conditions are prerequisites for key figure disaggregation?

  • A. The key figure is set to Not Editable.
  • B. The key figure is calculated and editable.
  • C. The key figure is stored and editable.
  • D. The key figure is calculated and aggregation mode is selected.

Answer: C

 

NEW QUESTION 26
You are reviewing the master data types for supply planning. Which master data types are compound master data types? Note: There are 2 correct Answers to this question.

  • A. LOCATIONFR
  • B. SOURCEPRODUCTION
  • C. SOURCECUSTOMER
  • D. sourcelocation

Answer: C,D

 

NEW QUESTION 27
Which of these conditions must be met to create a Local Member key figure?

  • A. Activate Local Member Recognition is selected.
  • B. A key figure is selected in the Key Figures tab in the Microsoft Excel add-in.
  • C. Use Excel Cell References in Report Editor is selected.
  • D. A key figure is created in the Planning Area app.

Answer: A

 

NEW QUESTION 28
You are creating advanced copy operators as part of an SAP IBP solution that is being implemented.
What do you need to be aware of when defining data transfer? Note: There are 2 correct Answers to this question.

  • A. Specifying target key figure that is time independent is possible.
  • B. Specifying target key figure is mandatory.
  • C. Specifying source key figure is mandatory.
  • D. Selecting by attribute with option 'contain' is possible.

Answer: B,C

 

NEW QUESTION 29
While modeling costs for optimization, you are conscious of the necessity to respect inventory targets and meet demands in the short term.
Which of the following are valid relationships between costs you must adhere to?
Note: There are 2 correct Answers to this question.

  • A. Target inventory violation cost should be less than transportation cost rate.
  • B. Target inventory violation cost should be less than max inventory violation cost.
  • C. Target inventory violation cost should be greater than inventory holding cost rate.
  • D. Target inventory violation cost should be greater than discount for demand lateness.

Answer: A,C

 

NEW QUESTION 30
Which property of an attribute will allow it to be used as an attribute as a key figure?

  • A. Type DECIMAL
  • B. Type TIMESTAMP
  • C. Type INTEGER
  • D. Type NAVCHAR

Answer: A

 

NEW QUESTION 31
Which of the following functional areas are included in the out-of-the-box SAP Integrated Business Planning application for sales and operations? Note: There are 3 correct Answers to this question.

  • A. Demand-driven materials requirement planning
  • B. Consensus demand planning
  • C. Executive review
  • D. Rough-cut supply planning
  • E. Finite resource capacities planning

Answer: B,C,D

 

NEW QUESTION 32
Which of the following is one of the functions of multi-echelon inventory optimization?

  • A. Ability to optimize delivery costs between different locations
  • B. Ability to optimize lead times between different locations
  • C. Ability to maintain high external service levels with low internal service levels
  • D. Ability to maintain high external service levels with high internal service levels

Answer: C

 

NEW QUESTION 33
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct Answers to this question.

  • A. Configure at most two input key figures on the same planning level in a key figure calculation.
  • B. Assign the compound master data type and its component master data types.
  • C. Configure at least one calculated key figure for the planning area.
  • D. Specify a planning horizon in the planning area for each level of the assigned time profile.

Answer: B,D

 

NEW QUESTION 34
......